That Tuesday I burned through $340 in parts because I skipped one dumb step
I want to tell you about a stretch last month that started great and went bad fast. I had a run of 9 calls in a row where every one went smooth, dryer belts and a fridge defrost board and a washer pump swapped out with no callbacks. Then Tuesday hit. I skipped checking the compressor windings on a fridge because the thing was only 4 years old and I was already 40 minutes behind. Swapped the relay and start cap, kicked on fine in the driveway, and it died again two days later. By the time I ate the cost on that job, a redo on a dishwasher I misdiagnosed, and a parts order I couldn't return, I was out $340. The lesson stung because the meter check would have taken me 3 minutes. What's your cutoff for when you're running late, do you still do the full check or do you start cutting corners?