Why does nobody talk about how long it takes to dial in a new fixture on a 3 axis mill?
I burned a whole 9 hour Saturday last week trying to get a new fixture squared and indicated on my Haas, and it took me 3 tries before I figured out the jaw was the problem, so now I'm wondering if there's a faster way to check tram on a fixture before I even bolt it down.