I finally hit 500 yards of flatwork poured this season and the number that shocked me was 3
I do small residential stuff around Boise, mostly driveways and patios, and I keep a tally on my clipboard. Crossed 500 yards for the season last week, which is way more than the 300 I guessed back in April. But the part that got me was only 3 callbacks for finish problems all year, and 2 of those were the same homeowner hosing a slab down in direct sun. I used to get 10 or 12 a season, so I'm trying to figure out what actually changed. Is it the cure and seal timing, or did I just get less fussy about starting early? Curious if you guys track your callback rate at all or is that just me being a nerd about it.