Hot take: the day our concrete sub sent 14 guys instead of 6 and we got a full pour done before the rain hit
Two weeks ago the ready-mix truck showed up at 6:45 and the sky to the west looked mean. The sub's foreman called in extra hands without asking me first, which normally would tick me off, but those 14 guys had the slab floated and broomed by 11:20. At 12:10 the sky opened up and we sat under the trailer awning watching a job we had penciled in for two days finish in one. How do you all handle subs who change manpower on their own without a heads up?