Debate: is it smarter to pour a slab first or frame the shed and pour under it after?
My 10x12 shed build in Arlington stalled when a storm dumped 2 inches of rain the day after I framed the walls, and I had to shovel mud out of the footing trenches for 3 hours to save it. Some guys swear framing first and pouring after keeps the wood drier, others say slab first is the only way to get a level base. Which side are you on, and what made you pick it?