The level on my new workbench was dead wrong, the floor was the liar
Used a 4 foot level to set up my new workbench in the garage, checked it twice, felt solid. After a week of stuff rolling off I grabbed a 6 foot straight edge and found a 1/4 inch dip in the concrete slab, the level was bridging it the whole time. Has anyone else trusted a short level on an old garage floor and paid for it later?