Update: welded my first 2 inch pipe uphill with 6010, now the foreman wants me on the 6 inch
Caught a choice last month on a tank job outside Gary: stick with the small bore work I knew or jump to the 6 inch butt welds that pay more but scare me half to death. I took the 6 inch and my first pass looked like a caterpillar with a bad attitude, but the guy next to me showed me a whip technique that fixed it. Now I'm wondering if I moved up too fast or if that nervous feeling is just how it goes. Any of you regret jumping to bigger pipe before you were really ready?