Question about keeping a line straight on long walls
Had a 40 foot wall last week and my line kept drifting on me halfway down. I tried tying the line to a stake at each end and snapping a chalk line every 10 feet instead of trying to string one long line. Worked way better, stayed dead on the whole run. Used a torpedo level on each course too just to check myself. Anyone got a better trick for keeping long runs true when the wall gets past 30 feet?