Switched from a 4 foot level to a 6 foot and I'm never going back
Been laying block for 11 years and always used a 4 foot Stabila for everything. Last month I picked up a 6 foot level for a long wall job on a garage in Boise and it was a game changer, caught a 5/8 inch bow I would've missed for sure. The 4 footer stays in the truck now unless I'm doing piers or small stuff. Anyone else made the switch or do you just run a string line for everything?