Walked into a shop in Portland and saw 40 drawers labeled with blue tape, no pulls on any of them
Stopped by a guy's garage shop off Division St last Friday to buy a used dovetail jig, and every cabinet in there had painter's tape where the hardware should go. He said he's been "deciding" on pulls for 3 years and just opens them with his thumbnail. Made me feel better about the 6 taped drawers sitting in my own shop right now. How long do you let a job sit before you finally drill for hardware?