Pro tip: ran my tool crib down to 3 insert screws and found out why my scrap rate hit 6%
Shop I'm at runs two Haas VF2s and a lathe, and for months my scrap sat around 6%, mostly chatter and bad finishes on aluminum parts. I blamed the machine, checked the level, messed with speeds and feeds, the usual panic. Turned out my insert pockets were loaded with chips and I was down to 3 spare screws in the crib because nobody reorders. Cleaned everything, torqued the screws right, scrap fell to under 2% on the next run of 400 parts. Now I want to know, what's your shop's rule on crib minimums? Do you keep a sheet or is it all in somebody's head?