DAE have a slab curl up 3/8 of an inch on a garage floor in Phoenix and blame the mix?
Poured a 24x30 garage slab out in Phoenix back on the 14th and two days later the corners were lifting almost 3/8 of an inch. I cut the control joints later than I should have and the wind was ripping all afternoon so the surface dried way faster than the middle. I told the homeowner I'd grind the high spots and patch the edges, but part of me still wonders if the ready mix was short on water or if I just did too little curing. Anyone got a favorite cure method for hot dry pours like that, or am I just eating this one?