Superintendent on my Des Moines job told me to stop babysitting the subs
I used to walk every trade's work twice a day and catch small stuff, but he pulled me aside and pointed out I was spending 3 hours a day re-checking framing that was already covered by the time I got back there. Since I cut it to one morning walk and one afternoon walk with a written punch list, I've got way more time for the RFI log and the subs actually flag problems to me sooner. What does your weekly site walk schedule look like, and do you split it up by trade or just go floor by floor?