Warning: a 30 year guy at the shipyard caught me skipping my fit-up checks on a waterwall panel
Last Tuesday at the yard in Norfolk I was rushing a waterwall panel into place and a guy named Ray with 30 years in walked over and tapped my tape. He said, "You measured once and got lucky, that's how guys get sent home with a crane hook and a bad panel." He made me pull the whole thing back out and re-check every seam, and sure enough two of my gaps were off by 3/16 of an inch. I've been fitting panels for 6 years and that 10 minute re-check saved me a whole afternoon of rework. How do you guys handle the pressure when a foreman is breathing down your neck about getting the next panel up?