Vent: guys keep caulking the seam before the cabinet boxes are shimmed level
I've fixed three installs in the last two months where somebody ran a bead at the wall seam with the box still 1/8 inch out of level, then the doors dragged once the boxes settled. Shim and level first, then caulk, it's ten extra minutes. Anybody else seeing this on sub work around here?