26
Noticed something at a job site in Nashville that bugged me all day
I was measuring for a tile layout at a new build near the Gulch and the GC had his crew stacking drywall right on the damp slab. They'd been pouring concrete 4 days prior and the pallets left dark stains everywhere. When I asked about it, the foreman just shrugged and said it dries out on its own. I get the deadline pressure, but we all know that moisture gets trapped and you're asking for mold or warping later. Has anyone else dealt with a GC who ignores basic sequencing like this?
1 comments
Log in to join the discussion
Log In1 Comment
kelly619d ago
...and that's the thing, right? Everybody knows concrete takes way longer than four days to fully cure. The stains are just the visible part. That moisture is sitting right there against the drywall paper, and once the walls are closed up, you've basically sealed in a problem. I've seen this exact scenario turn into a nightmare six months later when the homeowner notices that musty smell in the corner. The foreman shrugging it off just tells me he's done it before and got lucky, or he doesn't care because he won't be the one dealing with the callbacks. It's not about being fancy or overthinking it, it's just basic building sense. Your gut was right to be bugged all day.
5