Changed my mind about using the old cutterhead on the Lake Erie project
We were about 200 yards off the breakwall near Cleveland when the whole rig started shaking like a washing machine with a brick in it. I shut it down and found three of the old teeth had sheared clean off, jamming the works. My lead told me to just swap the teeth, but I insisted we pull the whole head and put on the spare we had. Took us six hours, but we ran smooth for the rest of the week. Anyone ever have a cutterhead failure that bad?
That's a solid call pulling the whole head. Used to think swapping teeth was enough until a partial fix cost me two days on a job. Your six hours was way smarter in the long run.
You ever have one of those moments where you realize you've been doing something the hard way for years? Totally changed my mind on this after a similar call went south on me. @patel.leo probably gets it - sometimes the full swap is just peace of mind.