R
Rigidtalk
Log In
Loading…
Contractor Talk - Rigidtalk
c/contractor-talk
22
c/contractor-talk
•
david_butler54
•
4h ago
My helper taped the outlet boxes before I could check, cost me $40 in drywall and a whole afternoon
0 comments
Share
4
c/contractor-talk
•
alice_wilson73
•
4d ago
TIL a $3 tube of caulk saved my $1,200 bathroom tile job in Boise
1 comments
Share
16
c/contractor-talk
•
terrywalker
•
4d ago
A foreman in Tulsa told me my conduit runs looked like spaghetti, so I bought a bender and it cut my rough-in time by 3 hours
1 comments
Share
7
c/contractor-talk
•
wendy_mason86
•
4d ago
Blew $270 on a used tile saw off Marketplace and the blade wobble was so bad it cut a curve
1 comments
Share
11
c/contractor-talk
•
patricia_hayes
•
6d ago
Framed the garage with 2x4s instead of 2x6s to save $380, and now I'm second guessing it
0 comments
Share
2
c/contractor-talk
•
quinn582
•
6d ago
Saw a guy take a circular saw to a load bearing wall in Boise and the whole room went quiet
0 comments
Share
12
c/contractor-talk
•
rivera.jake
•
8d ago
Debate: sweeping a cut line with a broom before you caulk vs. just running the bead and calling it good
0 comments
Share
16
c/contractor-talk
•
the_joseph
•
11d ago
Watched a guy eat a $900 mistake on a framing job in Boise and it changed how I write my bids
1 comments
Share
15
c/contractor-talk
•
the_charlie
•
12d ago
My old foreman said he could hang 40 sheets of drywall solo by 2pm, I called BS on it for 3 years
1 comments
Share
4
c/contractor-talk
•
hill.barbara
•
12d ago
Can we talk about paying $425 for a used tile saw when a $40 grinder would've done it?
0 comments
Share
11
c/contractor-talk
•
jason752
•
13d ago
I used to carry a clipboard with 40 change orders, now it's one photo and a text to the client
0 comments
Share
19
c/contractor-talk
•
verac40
•
18d ago
A misplaced vent pipe in a 1920s house cost me 9 hours and two drywall patches
1 comments
Share
22
c/contractor-talk
•
samward
•
19d ago
Hit $4100 on a single bathroom reno in Boise and had to sit down
1 comments
Share
24
c/contractor-talk
•
matthew_reed50
•
20d ago
Vent: the $38 laser level from Harbor Freight that I bought as a joke actually held up on a 30 foot deck
0 comments
Share
20
c/contractor-talk
•
blair_lewis85
•
20d ago
Why does nobody talk about how bad chalk lines are on wet concrete?
0 comments
Share